City of Arvada - Arvada Police Sub Stations

  • Exterior view 

Arvada Police Sub Stations

Showcase Project: City of Arvada

Location

Arvada, CO

Project Size

Two Buildings,
9,500 Square Feet Each

Annual Energy Use (Source EUI)

Baseline
(ASHRAE Standard)
297 kBtu/sq. ft.
Expected
(2015)
202 kBtu/sq. ft.
Actual
(2015)
COMING in 2015

Expected
Energy Savings:

32%

Annual Energy Cost

Baseline
(ASHRAE Standard)
$20,700
Expected
(2015)
$14,200
Actual
(2015)
COMING IN 2015

Expected
Savings:

$6,500



Background

The City of Arvada encompasses 34 square miles and is located at the base of the foothills between Denver and Boulder. The Arvada Police Department is a full service police department serving approximately 106,000 people and organized under two divisions: Operations and Field Services. The police department building was originally located near Old Town Arvada on Grandview Ave and was relocated to the City Hall campus in 1973.

Solutions

Annual energy savings for the project are expected to reach approximately 25% relative to a traditional building built to current code, ASHRAE 90.1-2007 standards. Combining the use of high performance lighting, envelope and equipment options yield a final predicted 32% savings and $6,500 in annual energy cost savings for building electricity and gas consumption.

Other Benefits

The Arvada police station project is expected to achieve a LEED Gold rating and will help the City work towards its overall goal of reducing energy use. It will serve as a model for the community and lead by example in terms of demonstrating the payback period and cost savings achievable when following energy efficient design standards. Finally, with the installation of an electric vehicle charging station, the city fleet will have the ability to further the use of alternative fuels, which will increase visibility of electric vehicles in the area.

Exterior view

Background

The facility was renovated in 1993, and in the years since, has undergone a variety of changes, including the expansion of the dispatch center in 2006. The Arvada Police Department has grown from 119 sworn positions and 49 non-sworn positions in 1993 to the current staff size of 166 sworn officer positions and 72 non-sworn employees, while remaining located at the City Hall campus.

This project is not a retrofit; rather, it includes the new construction of two police sub stations. In 2012, the city passed an ordinance requiring all government buildings greater than 5,000 square feet in size to achieve a minimum standard of LEED Silver; these will be the city’s first LEED-certified buildings. Construction of the two police sub stations began in May of 2013 and was completed in February of 2014.

View new construction photographs.

Solutions

The new Arvada Police Stations will implement the following energy efficiency initiatives:

  • Building Envelope: The buildings will feature well insulated walls with a U value of .059, and roof insulation tops out at R-30. Windows have been strategically placed to maximize passive solar heating and cooling and feature thermally broken aluminum frames on all facades. The western façade windows have Argon-filled glazing and a low Solar Heat Gain Coefficient. Overhangs and vertical fins provide window shading in the warmer months.
  • Lighting and Interior Loads: Through efficient lighting decisions, the lighting power density has been reduced to 20% below code. Daylighting is prominent in perimeter spaces as well as the center circulation area, and occupancy sensors will be installed in many areas including the community room, conference rooms, lobby, and restrooms.
  • HVAC: The stations will utilize highly efficient SEER 21 condensing furnaces, complete with variable speed compressors and high-efficiency motors.
  • Water Conservation: The buildings will feature condensing water heaters, with low flow showers and lavatories.

Return on Investment
A combination of LED and CFL lighting with occupancy sensor controls and daylighting controls were used for the project. The overall cost premium was $17,500 over code base and provides annual savings of $5,000, a payback of 3-4years. Daylighting controls will save $1,228 annually and pay for themselves in 5 years, while lighting controls will save $108 per year and have a simple payback period of 1 year. The west glazing with low SHGC will save $159 per year and have a payback of just 5 years. The Argon fill for all glazing will save $56 per year and also have a simple payback of 5 years. The R30 roof will save approximately $132 per year and will have a simple payback period of 15 years. Condensing furnaces with variable speed indoor fans and SEER 21 split DX cooling with 2-stage compressor modulation were selected for the project and provide annual savings of $1,400 above code base, a payback of 7 years. Condensing water heaters with low flow showers and lavatories were utilized with a cost premium of $1,500 and a payback of 12 years.

Building Modeling Results for the Project

No. Strategy Cost of Electricity Cost of Natural Gas Annual Energy Cost Annual Savings Relative to Cost Base % Cost Savings (LEED) LEED Pts Total Emissions (lbs CO2) Simple Payback (Yrs)
LB LEED Base - ASHRAE 90.1 - 2007 $15,690 $5,043 $20,733 - - - 433,877 -
P Base for cost payback analysis $12,075 $5,204 $17,279 - 16.7% 3 316,887 -
ENV1 R30 roof $12,042 $5,105 $1,7147 $132 17.3% 3 314,492 15
ENV2 R38 roof $12,025 $5,063 $17,088 $191 17.6% 3 313,515 25
ENV3 R19 batt wall $12,116 $5,346 $17,462 -$183 15.8% 2 319,902 -
ENV4 R21 batt wall $12,112 $5,334 $17,446 -$167 15.9% 2 319,665 -
ENV5 1.55 Thermax w 1.5 $12,068 $5,185 $17,253 $26 16.8% 3 316,525 10
ENV6 west glazing with low SHGC $11,914 $5,206 $17,120 $159 17.4% 3 316,138 5
ENV7 Argon fill for all glazing $12,079 $5,144 $17,223 $56 16.9% 3 315,742 5
HP ENV High Performance Envelope (ENV1, 5, 6 & 7) $11,883 $5,024 $16,907 $372 18.5% 4 312,046 10
LTG1 Daylighting ctrls $10,516 $5,163 $15,679 $1,228 24.4% 7 291,346 5
LTG2 Lighting ctrls $11,761 $5,038 $16,799 $108 19.0% 4 310,109 1
HP ENV + LTG Daylighting and lighting controls $10,408 $5,174 $15,582 $1,325 24.8% 7 289,535 5
SYS 1 RTU w/ electric reheat $16,818 $4,737 $21,555 -$5973 - - 398,684 -
SYS 2 Daikin RTU w ERV & elec reheat $15,709 $744 $16,453 -$871 20.6% 5 335,956 -
SYS 3 Condensing SEER 21 Furnace $9,023 $5,134 $14,157 $1,425 31.7% 10 283,898 -
HP ENV + LTG + HVAC Condensing SEER 21 Furnace $9,023 $5,134 $14,157 $1,425 31.7% 10 283,989 7

Other Benefits